2024年4月23日

Silver Extrusion Press line tested in Miami on Apr 2024

MSGC GROUP has sent engineer for test the 750MT customized silver extrusion press on Apr,2024. The project equipped with melting furnace from Italy, auxiliary machines from Germany and Switzerland. This project use continuous casting furnace to cast the silver billet and then deliver to extrusion press to extrude the silver strip, the handling table is quite simple without puller, the operator pull the strip manually from the exit of press to the handling table, and then the strip be coiled into rollers before punched into coils according to different sizes. The silver coins be used for purpose of bank or souvenirs of playgrounds. The press just took 5 days test and then into production.
2024年2月8日

2200MT Aluminium Extrusion line delivered to Mexico city, Mexico on 2023

MSGC GROUP has delivered a turnkey project regarding 2200MT Aluminium Extrusion line to Mexico city on 2023. The project including : 2200MT short stroke front loading type Aluminium Extrusion Press, 55 meters handling table, 150 Ton single operator stretcher, triple head double puller with hot saw and aluminium chip collector, measuring table, finish saw, 45 kW nitriding furnace, 4 chambers die oven, 19 meters aging oven, 160 Ton aluminium scrap baler. The client has purchased a project from MSGC GROUP on 2012, expanding the factory on 2023 for the new project. The aluminium extrusion line has be tested within 3 months in the end of the year 2023.
2024年2月8日

1800MT Aluminium Extrusion line supplied to Tijuana, Mexico on 2022

MSGC GROUP has supplied a 1800MT Short stroke Back loading with shifting stem press to Tijuana, Mexico. Due to corona virus we have a local client has delayed their project, so the 1800MT press was in stock, from the date of signing the contract till we delivered the press only takes 2 months. Unfortunately we are unable to despatch our technician to Tijuana for install the press due to the virus, we have created a online group with client’s skillful engineers for communication during installation & debugging. In 2 months the press be installed & get into production. In the year 2023 we has visited the client in Tijuana and got agreement with them to make plan for after sales service for our press.